SURAT PERINTAH KERJA (SPK) |
Nama Lembaga: UNIT PELAKSANA TEKNIS DAERAH (UPTD) SATUAN PENDIDIKAN SMPN 1 AMBULU | ||||
|---|---|---|---|---|---|
| Nomor SPK: SPK/17316369285 | |||||
| Tanggal SPK: 22/08/2024 | |||||
| Paket Pekerjaan: Transaksi jual beli di alfanani.com |
|||||
| SPK ini mulai berlaku efektif terhitung sejak tanggal ditetapkan dan penyelesaian keseluruhan pekerjaan sebagaimana dimaksud dalam SPK ini. | |||||
| Waktu pelaksanaan pekerjaan: 22/08/2024 | |||||
| RINCIAN PEKERJAAN | |||||
| NO | NAMA BARANG | MEREK | HARGA SATUAN | JUMLAH (QTY) | TOTAL |
| 1 | Rel MCB |
|
12.000 | 3 | 36.000 |
| 2 | Fuse |
|
16.000 | 5 | 80.000 |
| 3 | CT |
|
70.000 | 5 | 350.000 |
| 4 | Isolasi double tape 3m |
|
28.000 | 3 | 84.000 |
| 5 | Isolasi |
|
15.000 | 6 | 90.000 |
| 6 | Terminal Blok 200 A |
|
100.000 | 1 | 100.000 |
| 7 | Skun 1,25 |
|
35.000 | 2 | 70.000 |
| 8 | Skun 2,5 |
|
45.000 | 2 | 90.000 |
| 9 | Tedus B5 |
|
40.000 | 3 | 120.000 |
| 10 | Masko 8G |
|
45.000 | 4 | 180.000 |
| 11 | Skun 16mm |
|
12.500 | 25 | 312.500 |
| 12 | Duct sisir 33x33 |
|
200.000 | 2 | 400.000 |
| 13 | Duct sisir 50 x 50 |
|
35.000 | 5 | 175.000 |
| 14 | Plat sisir 3p |
|
155.000 | 1 | 155.000 |
| 15 | Klem blok 12p |
|
28.000 | 3 | 84.000 |
| 16 | Box panel 50 x 70 |
|
450.000 | 1 | 450.000 |
| 17 | Kabel nyy 4 x 1,6mm |
|
138.000 | 20 | 2.760.000 |
| 18 | Kabel nym 4 x 4mm |
|
38.500 | 30 | 1.155.000 |
| 19 | Kabel nym eterna 3 x 25 |
|
20.500 | 150 | 3.075.000 |
| 20 | Kabel 2 x 1,5 eternal |
|
14.000 | 150 | 2.100.000 |
| 21 | Kabel sr |
|
11.000 | 150 | 1.650.000 |
| 22 | Mcb domae 10a |
|
62.000 | 18 | 1.116.000 |
| 23 | Lampu pilot panel listrik |
|
14.000 | 5 | 70.000 |
| 24 | Isolator imundex 2,5mm |
|
33.200 | 2 | 66.400 |
| 25 | Isolator ms 12mm |
|
14.500 | 6 | 87.000 |
| 26 | Isolator ms 14mm |
|
18.500 | 5 | 92.500 |
| 27 | Isolator 10mm |
|
23.500 | 3 | 70.500 |
| 28 | Pakmal bs |
|
32.500 | 2 | 65.000 |
| 29 | Kabel nyaf 0,75 |
|
7.000 | 60 | 420.000 |
| 30 | Ampere digital sirkuit |
|
551.000 | 1 | 551.000 |
| 31 | Mccb 75a schneider |
|
440.000 | 1 | 440.000 |
| 32 | Wiring Panel Dan Penggantian Tufur Kabel |
|
3.500.000 | 1 | 3.500.000 |
| Sub Total | Rp.19.994.900 | ||||
| Asuransi | Rp.0 | ||||
| Ongkos Kirim | Rp.0 | ||||
|
Terbilang : Sembilan Belas Juta Sembilan Ratus Sembilan Puluh Empat Ribu Sembilan Ratus Rupiah |
Total | Rp.19.994.900 | |||
| INSTRUKSI PEMBELI Penagihan dilakukan setelah penyelesaian pekerjaan yang diperintahkan dalam SPK ini dan dibuktikan dengan Berita Acara Serah Terima. |
|||||
| Penjual ALFANANI MEDIA JAYA Eko Waseso Direktur |
Pembeli UNIT PELAKSANA TEKNIS DAERAH (UPTD) SATUAN PENDIDIKAN SMPN 1 AMBULU Moh. Zaeni, S.Pd. M.Pd NIP. 196703141989011004 |
||||